Energy analysis, project development and delivery for efficiency, electrification, solar and storage projects across the Baltimore metro.

Energy analysis

Every project starts with how your building actually uses energy.

  • Utility bills and 15-minute interval data, with your authorization

  • Rate and tariff modeling

  • Upgrade options ranked by savings and cost

  • Year-by-year cash flow for each option

Efficiency upgrades

The cheapest energy is the energy you don’t use.

  • LED lighting and controls

  • Building automation and HVAC optimization

  • Envelope and HVAC assessments

  • Measured savings after installation

Electrification

Efficient electric systems that replace fuel burned on site, planned around your equipment’s replacement cycle.

  • Heat pumps for heating and cooling

  • Heat-pump water heating

  • Electrical capacity planned in advance

  • Timing aligned with BEPS deadlines

Solar & storage

On-site power where the roof, the load and the rate support it.

  • Rooftop and carport solar

  • Batteries for demand-charge savings and backup power

  • Production modeled with industry-standard tools

  • Utility interconnection managed for you

BEPS compliance

Maryland’s Building Energy Performance Standards require annual benchmarking for most buildings of 35,000 sq ft or more, with emissions standards from 2030.

  • ENERGY STAR Portfolio Manager setup and annual filing

  • A 2030 roadmap built around on-site fuel use

  • Upgrades timed to equipment end of life

BEPS measures fuel burned on site, so electrifying heat and hot water is what moves the number.

C‑PACE project development

Maryland’s C‑PACE program lets owners pay for qualifying upgrades through a charge on the property tax bill.

  • Pre-application and application prepared for you

  • Engineering package for the program’s technical review

  • Coordination with your capital provider through closing

How we work

How a project moves

Screen — no cost

We review 12 months of utility bills and the building basics, and tell you quickly whether there’s a project worth pursuing.

Analyze & propose

Detailed load and savings modeling, an engineering review, and a proposal with year-by-year cash flow.

Financing

We prepare the application package and work with your capital provider through closing.

Build

We procure the major equipment and coordinate permits, trade partners and inspections.

Verify & support

Commissioning, utility approvals and performance tracking after handover.

What you’ll need to start

Most owners have these on hand:

  • 12 months of utility bills, or permission to pull them

  • Basic building details — size, age and main equipment

Have a building in the Baltimore area?

Tell us the basics. We’ll reply with the next step.